Книга Estimating Performance Time for Air Force Military Construction Projects Greg J Hoffman

Estimating Performance Time for Air Force Military Construction Projects

Автор: Greg J Hoffman
Език: Английски език
Корици: С меки корици
Издател: Biblioscholar
Наличност: Външен склад
Изпращаме след 14-21 дни
20.61 40.32 лв
The prediction of construction time performance is a problem of interest to both researchers and con...

Информация за книгата

Автор
Език
Английски език
Корици
Книга - С меки корици
Издадена
2012
страници
234
EAN
9781288397778
ISBN
9781288397778
Enbook ID
08249449
Издател
Теглоt
426
Размери
189 x 246 x 12

Пълно описание

The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks toidentify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time predictionmodel. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e.g. airfieldpavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither modelproduced acceptable results for non-facility projects; however, the multiple linear regression model was found to provide the most acceptable time predictionmodel for facility projects.As with the BTC model and previous research reported in the literature, there was a significant correlation between cost and duration. However, severalother factors were also identified that resulted in significantly lower than average construction durations.

Може също да ви хареса

Echoes of Enlightenment

Suzanne M. Bessenger
46.20 90.36 лв

Wreckage

Niall Griffiths
9.03 17.65 лв

Holiness Highway

Mary L Barnes
30.30 59.26 лв

Dead Midnight

Marcia Muller
18.21 35.61 лв
403.36 788.90 лв

Клиенти, които купиха тази книга, купиха също

20.46 40.03 лв
415.80 813.24 лв